Site criteria

Infrastructure asset evaluation criteria

We underwrite physical clean energy assets through empirical engineering metrics, prioritizing grid connection viability, environmental baseline surveys, and long-term landholder covenants before committing capital.

Underwriting metrics

Primary feasibility thresholds

< 5 km

substation proximity threshold

Tier 1

interconnection queue feasibility

< 4%

maximum topography gradient

Evaluation pipeline

Active development sectors

Every prospective project undergoes disciplined engineering review, evaluating interconnection capacity, land slope, and resource density prior to development progression.

Utility-Scale Photovoltaics

Topographic Ridgeline Wind

Substation Battery Storage

Rigorous site assessment prioritizing high global horizontal irradiance, flat parcel contiguity, and minimal ecological disturbance across arid and semi-arid terrain.

Disciplined anemometry campaigns and acoustic buffer modeling for high-yield elevated corridors with direct access to existing high-voltage transmission rights-of-way.

Industrial-grade lithium iron phosphate storage enclosures positioned adjacent to utility interconnects to mitigate curtailment and enhance local distribution resilience.

Submit parcels for review

Landholders and co-developers can initiate structured underwriting assessments for contiguous acreage with confirmed substation access.